1.5 GW Gas-Fired Combined Cycle Independent Power Plant

1,500-MW Uzbekistan Combined Cycle Power Plant: Gas Booster Units for China Energy Engineering Group.
View details

Atlas GT063

Each blade on the near-inlet side of the first-stage impeller shows similar fatigue-induced, dark-colored cracks approximately 10 mm long.
View details

U.S.-made GE Compressor SRL601

The unit control system experienced extremely low oil pressure, excessively high bearing temperatures, and elevated rotor vibration levels—leading to severe wear in the unit's transmission components, bearings, oil-gas seals, and other critical parts. Additionally, noticeable wear was observed on the impeller's pressure angle.
View details

Atlas 3P-10/6/6/6

Starting in May 2024, the thrust face temperature of the booster unit’s third-stage thrust bearing has been steadily rising, reaching as high as 104°C by June 2025. Additionally, surge phenomena have occurred intermittently over the past two years.
View details

Atlas GT123L3K1

At the beginning of 2025, the manufacturer discovered similar fatigue-induced dark cracks, each approximately 10 mm long, on the near-inlet side of every blade in the first-stage impeller.
View details