Complete Machine Case

SEI Thailand IRPC External Heater Project


Industry:

Petrochemical

Date:

2019

Pressure:

1-4 BarA

Power:

2800 kW (2.8 MW)

Throughout:

52,985 kg/h

Project Info:

In 2017, our company signed a contract with Sinopec Engineering Inc. (SEI) to supply complementary compressor units for SEI’s turnkey project—the External Heat Exchanger Project in Thailand—owned by IRPC (Indorama Refining and Petrochemical Company). During the project execution, the equipment provided by our company demonstrated stable and reliable performance, while our after-sales service was swift and highly effective. As of April 2019, the unit successfully completed a comprehensive three-day performance test, with all key performance indicators exceeding the values guaranteed in the contract. Notably, steam production surpassed the contracted target by an impressive 3.5 tons per hour, showcasing exceptional results. Thanks to our outstanding product performance and expert service support, our company earned high praise and recognition from the general contractor.

 

RoyalTurbo Engineering (Hangzhou) Co., Ltd.
视频标题